Section 3

  • Network devices are being installed: power supply, water supply, heating, fire-prevention systems, commercial and household drain, external engineering systems.
  • Brackets and porcelain tiles of a ventilated façade is being installed
  • The wet facade is being installed.
  • The device of a metal frame under the boiler room is being installed.

 

Section 5

  • Concreting slabs
  • Reinforcement and concreting vertical elements.

More photos in our Gallery 📸

Share