1. Concrete floor slab at the 8th floor
  2. Concreting of vertical elements at the level of the 8th floor
  3. Bricklaying on the 2nd floor level
  4. Concreting of the floor slab at the level of the 9th floor
  5. Reinforcement of vertical elements at the level of the 9th floor
Share