1. Arrangement of external walls of ceramic blocks at the level of the 3rd, 4th and 5th floors
  2. Arrangement of flights of stairs from the 7th to the 8th floor
  3. Arrangement of floor slab at the level of the 10th floor
  4. Concreting of vertical elements at the 9th and 10th floors
  5. Start of construction of the 5th section