Section 3
- The installation of external walls of ceramic blocks at the level of the 12th and 13th floors
- Concreting of vertical elements at the level of the 14th floor
- The device of the floor slab at the level of the 14th floor
- Installation of flights of stairs from the 11th to the 12th floor
- Masonry interior walls
- Installation of ventilation units
- Installation of window blocks 2-12 floors
Section 4
Pile field, concrete preparation
Section 5
Concrete foundation slab