Section 3

  1. The installation of external walls of ceramic blocks at the level of the 12th and 13th floors
  2. Concreting of vertical elements at the level of the 14th floor
  3. The device of the floor slab at the level of the 14th floor
  4. Installation of flights of stairs from the 11th to the 12th floor
  5. Masonry interior walls
  6. Installation of ventilation units
  7. Installation of window blocks 2-12 floors

 

Section 4

Pile field, concrete preparation

Section 5

Concrete foundation slab

 

More photos from the construction in our Gallery 📸