Section 3

  1. The installation of external walls of ceramic blocks at the level of the 6th and 7th floors
  2. The device of the floor slab at the level of the 11th floor
  3. Concreting of vertical elements at the level of 11th floors
  4. Arrangement of flights of stairs from the 8th to the 9th floor
  5. Installation of ventilation units

 

Section 4

Pile field, concrete preparation of grillages.

Section 5

Soil development, device for injection piles – 40pcs