Section 3
- The installation of external walls of ceramic blocks at the level of the 6th and 7th floors
- The device of the floor slab at the level of the 11th floor
- Concreting of vertical elements at the level of 11th floors
- Arrangement of flights of stairs from the 8th to the 9th floor
- Installation of ventilation units
Section 4
Pile field, concrete preparation of grillages.
Section 5
Soil development, device for injection piles – 40pcs