Section 3

  1. The installation of external walls of ceramic blocks at the level of the 10th and 11th floors
  2. Concreting of vertical elements at the level of the 13th floor
  3. The device of the floor slab at the level of the 13th floor
  4. Installation of flights of stairs from the 10th to the 11th floor
  5. Masonry interior walls
  6. Installation of ventilation units
  7. Installation of window blocks 2-9 floors

Section 4

Pile field; soil development according to the project, soil refinement is carried out manually for the concrete preparation device

Section 5

Pile field, concrete preparation under the foundation slab; reinforcement of the foundation slab is performed

More photos from the construction in our Gallery 📸