Section 3
- The installation of external walls of ceramic blocks at the level of the 10th and 11th floors
- Concreting of vertical elements at the level of the 13th floor
- The device of the floor slab at the level of the 13th floor
- Installation of flights of stairs from the 10th to the 11th floor
- Masonry interior walls
- Installation of ventilation units
- Installation of window blocks 2-9 floors
Section 4
Pile field; soil development according to the project, soil refinement is carried out manually for the concrete preparation device
Section 5
Pile field, concrete preparation under the foundation slab; reinforcement of the foundation slab is performed